ISS-60 mission


Main tasks

ISS-59/60

ISS-60/61

ISS crew:

Commander -
Ovchinin Alexey
Flight engineers:
Nick Hague
Christina Koch
Alexandr Skvortsov
Luka Parmitano
Andrew Morgan


Internet-Project

Планета Королёва
Русский

News

September 27, 2011.
The Ascent Unit/Zenit-2SB LV Mechanical Docking

At the Baikonur cosmodrome the prelaunch processing of Zenit-2SB launch vehicle (LV) with Upper Stage DM-SLB and Intelsat-18 telecommunication spacecraft is continued.

Today at the Assembly & Test Facility of the cosmodrome site 42 the specialists of the rocket-space industry provided general assembly of the Integrated Launch Vehicle: mechanical docking of the Ascent Unit consisting of Upper Stage DM-SLB and Intelsat-18 spacecraft under the payload fairing with Zenit-2SB LV. Upon completion of mechanical operations the specialists began to provide mating of electrical connections between the Launch Vehicle and the Ascent Unit.

These operations are conducted as per the schedule.

The launch of Zenit-3SLB Integrated Launch Vehicle with Upper Stage DM-SLB and Intelsat-18 telecommunication spacecraft is planned for October 2011.

 

 

Launches

September 25, 2019
LV Soyuz-2.1a with SC Soyuz MS-15 is planned
August 22, 2019
LV Soyuz-2.1a with SC Soyuz MS-14 is launched

Video


    

News Archive

September  2019
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30