ISS-63 mission


ISS-62/63

ISS crew:

Commander -
Christopher Cassidy
Flight engineers:
Anatoly Ivanishin
Ivan Wagner


Internet-Project

Планета Королёва
Русский

News

September 23, 2011.
Ascent Unit assembly is completed
for launch under Land Launch Program.

Underway is prelaunch processing of launch vehicle (LV) Zenit-2SB and telecommunication spacecraft (SC) at Baikonur Cosmodrome.

According to press service of Roscosmos and SC Yuzhniy, today at the Cosmodrome Assembly and Testing Facility on site 31 assembly of Ascent Unit (AU) has been completed: installation ("encapsulation") of payload fairing on spacecraft Intelsat-18 with Uppers Stage DM-SLB has been performed. Upon completion of electric checks and final operations AU will be transshipped to transport platform and carried to Cosmodrome site 42 for mating with launch vehicle.

Integrated Launch Vehicle Zenit-3SLB with Upper Stage DM-SLB and telecommunication spacecraft Intelsat-18 are scheduled for launch for October this year.

 

 

Launches

October, 2020
The launch of LV Soyuz-2.1a with SC Soyuz MS-17 is planned
July 23, 2020
LV Soyuz-2.1a with SC Progress MS-15 is launched

Video


    

News Archive

August  2020
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31