Photo Archive
Land Launch Program
SC Amos-4 Launch
September 1, 2013.
Amos-4 spacecraft was delivered into geotransfer orbit.
August 29, 2013.
Roll out of Zenit-3SLB ILV with US DM-SLB and Amos-4 SC to the launch site.
August 28, 2013.
Zenit-3SLB ILV has been transferred onto the transporter/erector.
August 24, 2013.
The Ascent Unit/Zenit-2SB LV Mechanical Docking.
August 22, 2013.
Amos-4 payload unit sent for launch vehicle integration.