Cronology of Extravehicular Activity

Space Flight Members Started and Ended (UTC) Duration, Criterion The EVA tasks and features
233 ISS
Expedition ISS-64
EVA-2
(Quest-based EVA)
Michael Hopkins
Victor Glover
14 h 28 min

21 h 24 min
January 27, 2021
6 h 56 min
(from the opening to the closure of the exit hatch)
Installation of antenna, power and data cables on Bartolomeo science platform of Columbus module.
Installation of satellite broadband communication terminal on Columbus module.
Removal of structures on truss P-6 to prepare for upgrade of ISS power supply system.
234 ISS
Expedition ISS-64
EVA-3
(Quest-based EVA)
Michael Hopkins
Victor Glover
15 h 56 min

21 h 16 min
February 1, 2021
5 h 20 min
(from the opening to the closure of the exit hatch)
Completion of installing new lithium-ion batteries on truss P-4.
Routing of new Ethernet local area network cables.
Replacement of external high resolution camera on the ISS starboard truss.
Installation of new cameras on Destiny module and Kibo module manipulator.
235 ISS
Expedition ISS-64
EVA-4
(Quest-based EVA)
Kathleen Rubins
Victor Glover
11 h 12 min

18 h 16 min
February 28, 2021
7 h 04 min
(from the opening to the closure of the exit hatch)
Installation of support equipment to mount new P6 solar array wings.
236 ISS
Expedition ISS-64
EVA-5
(Quest-based EVA)
Kathleen Rubins
Soichi Noguchi
11 h 37 min

18 h 33 min
March 5, 2021
6 h 56 min
(the egress hatch operational envelop))
Installation of modification kits for P6 solar array wings.
237 ISS
ISS
Expedition ISS-64
EVA-6
(Quest-based EVA)
Victor Glover
Michael Hopkins
13 h 14 min

20 h 01 min
March 13, 2021
6 h 47 min
(the egress hatch operational envelop))
Maintenance of the cooling system and Bartolomeo payload platform of the Columbus module. Replacement of wireless antenna assembly on Unity module and installation of structure to ensure integrity of the airlock.
238 ISS
ISS
Expedition ISS-65
EVA-1
(from the Poisk module )
Oleg Novitskiy
Petr Dubrov
5 h 53 min

13 h 12 min
June 2, 2021
7 h 19 min
(the egress hatch operational envelop))
Replacing fluid flow controller panel in the thermal control system of the FGB Zarya module.
Installing equipment for space experiments Test and Vynoslivost on the outer surface of the Poisk module.
Moving the cargo boom from the Pirs module to its stowage position on the Poisk module.
De-mating cables of the rendezvous and docking systems Kurs-P on the modules Zvezda and Pirs under the program of preparations for receiving MLM Nauka module.
239 ISS
ISS
Expedition ISS-65
EVA-2
(from the Quest module )
Shane Kimbrough
Thomas Pesquet
12 h 11 min

19 h 26 min
June 16, 2021
7 h 15 min min
(the egress hatch operational envelop))
Installation of the first of two iROSA solar array panels on the P6 truss using Canadarm-2 robotic arm.
240 ISS
ISS
Expedition ISS-65
EVA-3
(from the Quest module )
Shane Kimbrough
Thomas Pesquet
11 h 42 min

18 h 10 min
June 20, 2021
6 h 28 min min
(the egress hatch operational envelop))
Completion of installation and deployment of the first iROSA solar arrays on P6.

ISS Crew


Hoshide  AkihikoHoshide
Akihiko



leg Novitskiy Novitskiy
leg



Petr Dubrov Dubrov
Petr



Mark Vande Hei Vande Hei
Mark



Robert Shane KIMBROUGH KIMBROUGH
Robert Shane



Megan McArthur McArthur
Megan



Thomas PESQUETPESQUET
Thomas