BIRTH OF THE PROJECT
INTEGRTED TESTS
DEMO LAUNCH
"DirecTV-1R"
"ICO-F1"
"PanAmSat-9"
"Thuraya"
"XM Radio-2"
"XM Radio-1"
Galaxy-IIIC
Thuraya D2
EchoStar-IX
Galaxy-XIII/Horizons-1
Telstar 14/Estrela do Sul 1
DirecTV 7S
Telsat 18
XM Radio-3
Spaceway-1
Intelsat Americas-8
Inmarsat-4
Echostar-10
JCSat-9
Galaxy 16
KoreaSat 5
XM Radio-4
New Skies-8
Thuraya D3
DirecTV 11
Galaxy 18
EchoStar XI Galaxy 19 SICRAL  1B

 
homepage

sea launch

high spots
INMARSAT-4 LAUNCH

Russian
   

The Inmarsat-4 mission preparation began in September 2005 even before the completion of operations on annual maintenance of the Rocket Segment systems and equipment. The use of Zenit-2S LV ¹SL19 and Block DM-SL ¹20L was planned to launch the Inmarsat-4 SC.

CHRONOLOGY OF ACTIVITIES

September 5 – October 24, 2005

Activities at the Home Port:

  • Rocket Segment systems and equipment processing for activities at the Home Port and in the launch area;
  • Block DM-SL ¹20L processing, testing and fueling;
  • Zenit-2S LV ¹SL19 processing and testing;
  • Block DM-SL ¹14L (donor US) processing and testing;
  • Zenit-2S LV ¹SL15 (donor LV) processing and testing;
  • Assembly and testing of ILV as a part of Zenit-2S LV ¹SL19, Block DM-SL ¹20L and PLU with the Inmarsat-4 SC;
  • Block DM-SL ¹14L is transferred to the storage mode on ACS;
  • Check of the Rocket Segment with ILV “dry roll-out”.
October 25-31, 2005

ACS and LP passage to the launch area. Activities in the sea passage phase:

  • system and assembly parameter monitoring on LP and ACS;
  • ntegrated demonstration tests on ACS with involvement of all the Sea Launch Segments and structures.
November 1, 2005

ACS and LP arrival in the launch area.

November 2-7, 2005

Activities in the launch area:

  • equipment prelaunch maintenance;
  • Rocket Segment systems bringing to readiness for activities in the launch area;
  • ILV processing;
  • processing of the Upper Stage (as a part of ILV);
  • ILV roll-out and its installation on the launch pad;
  • ILV electrical checks and provision of critical launch readiness checklist, results analysis.
November 8, 2005
  • ILV prelaunch processing and launch;
  • communication sessions with US;
  • systems and assemblies bringing to the initial state.
November 8, 2005

At 17h 07 min, Moscow time (06h 07 min, Pacific standard time) a launch was performed from the Odissey launch platform. The Inmarsat-4 spacecraft was injected into the calculated orbit.

Postfligth operations, a start of passage to the Home Port.

LAUNCH RESULTS

The Inmarsat-4 spacecraft was injected into the calculated orbit:

Perigee altitude,
km
Apogee altitude,
km
Inclination,
deg.
310
35786
3

 

 

 

 