BIRTH OF THE PROJECT
INTEGRTED TESTS
DEMO LAUNCH
"DirecTV-1R"
"ICO-F1"
"PanAmSat-9"
"Thuraya"
"XM Radio-2"
"XM Radio-1"
Galaxy-IIIC
Thuraya D2
EchoStar-IX
Galaxy-XIII/Horizons-1
Telstar 14/Estrela do Sul 1
DirecTV 7S
Telsat 18
XM Radio-3
Spaceway-1
Intelsat Americas-8
Inmarsat-4
Echostar-10
JCSat-9
Galaxy 16
KoreaSat 5
XM Radio-4
New Skies-8
Thuraya D3
DirecTV 11
Galaxy 18
EchoStar XI Galaxy 19 SICRAL  1B

 
homepage

sea launch

high spots
THURAYA LAUNCH

Russian
   

CHRONOLOGY OF ACTIVITIES

August 12 - September 19, 2000 Upper Stage electropneumatic tests.
September 19-21, 2000 Upper Stage loading with high-boiling propellant components.
August 5 -September 20, 2000

LV processing.

September 20 -October 2, 2000

ILV assembly.

October 2-3, 2000

ILV transfer from ACS to LP. ILV tests on LP under the Dry Roll-Out program.

October 4-15, 2000 ACS/LP transit to the launch site.
October 15-20, 2000

Pre-launch processing.

October 21, 2000 At 9:52 A.M. Moscow Time (October 20 at 10:52 P.M. Pacific Time) is carried out the fifth launch under the Sea Launch program.

LAUNCH RESULTS

The Thuraya is placed into the calculated geosynchronous transfer orbit:

Perigee altitude,
km
Apogee altitude,
km
Inclination,
deg.
214
35786
6,3

 

 

 

 