Русский

News

August 28, 2013.
The rocket has been transferred onto the transporter/erector

Preparations for the launch of Zenith-2SB launch vehicle (LV) with the upper stage DM-SLB and Israeli spacecraft Amos-4 continue at Baikonur launch site.

In the processing facility of Area 42 at the launch site the rocket has been transferred onto a transporter/erector.

The work is performed according to schedule.

The launch of Zenith-2SB with the upper stage DM-SLB and spacecraft Amos 4 is slated for September of this year.

 

Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport

 

Launches

June 24, 2016
The launch of LV Soyuz with SC TMA MS is planned
March 31, 2016
LV Soyuz-2.1a with CV Progress MS-02 is launched.

News Archive

May  2016
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31