Русский

News

August 22, 2013.
Amos-4 payload unit sent for launch vehicle integration

Preparations for the launch of Zenith-2SB (LV) with the upper stage DM-SLB and Israeli spacecraft Amos-4 continue at Baikonur launch site.

Yesterday, the payload unit was loaded onto a transportation platform, and today it was transported to Area 42 of the launch site where it is to be mated with the launch vehicle Zenit-2SB.

The work is performed according to schedule.

The launch of ILV Zenith-3SLB with the upper stage DM-SLB and Israeli spacecraft Amos-4 is slated for September of this year.

 

Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport Photoreport

 

Launches

June 24, 2016
The launch of LV Soyuz with SC TMA MS is planned
March 31, 2016
LV Soyuz-2.1a with CV Progress MS-02 is launched.

News Archive

May  2016
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31