Cronology of Extravehicular Activity

Space Flight Members Started and Ended (UTC) Duration, Criterion The EVA tasks and features
196 ISS
Expedition ISS-50
EVA-1
(from the Quest module)
R. Kimbrough
P. Whitson
12 h 22 min

18 h 51 min
January 6, 2017
6 h 29 min
(from the opening to the closure of the exit hatch)
Replacement of Nickel Hydrogen (NiH2) batteries from EP S4 Integrated Equipment Assembly (IEA) Channel 3A with three lithium-ion batteries. Removal of S3 truss CETA cart light. Photo survey of Alpha Magnetic Spectrometer (AMS). Rousting of MDM Ethernet cable. Placing longitudinal protection covers on Node 3.
197 ISS
Expedition ISS-50
EVA-2
(from the Quest module)
R. Kimbrough
Т. Pesquet
11 h 21 min

17 h 17 min
January 13, 2017
5 h 56 min
(from the opening to the closure of the exit hatch)
Replacement of Nickel Hydrogen (NiH2) batteries from S4 Integrated Equipment Assembly (IEA) Channel 1A with three lithium-ion batteries. Replacement of Camera Light Pan Tilt Assembly (CLPA) on the Mobile Transporter Relay Assembly (MTRA) of MBS mast. Vertical installation of the solar array protection cover restraints and stowage of longitudinal protection covers of module Node 3. Installation of MMOD on Node 3. Installation of the interface adapter for the worksite accommodating foot restrains APFR. Routing of MDM Ethernet cable. Photo survey of the ISS USOS surface.